PHOSPHATE FERTILIZER COMPLEX
AIN SUKHNA, EGYPT
CLIENT
PETROJET
Project Description
The complex includes 5 plants for the production of phosphate and compound fertilizers, and pure phosphoric acid with production capacity of 2100 tons/day.
The Project consist in the following units:
- Granulated DAP Plant, with production capacity 1200 MTPD, (18-46-00), using H3PO4 @ 52% P2O5 and the pipe reactor technology.
- Granulated Triple Superphosphate, G-TSP, Plant with production capacity 750 MTPD, 42% P2O5 water soluble.
SCOPE OF WORK INCLUDED
Architectural and Structural design of the following electrical substations:
- Technical room control -unit 23.
- Technical room control -unit 26.
- Technical room control -unit 34.
- Technical room control -unit 36.
- Technical room control -unit 10/38.